Do you need a Survey? Click Here

COVID-19 Business Continuity – Still here if you need us

FOR IMMEDIATE RELEASE  – Updated COVID-19 Position Statement Regarding Centara’s Workforce (06/04/2020)

During these challenging times we feel it is important to Keep our customer and partners updated to the current position of our operations. Protecting the Health and Safety of our highly valued workforce and their immediate families and the wider population from exposure to the spread of the COVID-19 Corona Virus, whilst helping the national effort of reducing the impact on our NHS will remain Centara’s number one priority throughout the crisis that continues to test our country and the rest of the world.

Our Bureau Services, Utility Search Team, Design and CAD Engineering Drawing management teams were seamlessly mobilised in the home working environment at the start of the Lockdown and have continued to provide these service on an ongoing basis with minimal impact to service level agreements. We are providing the following services through our home working teams:

  • Utility Asset Records Searches (PAS128 QL-D)
  • CAD Bureau Services
  • Utility CAD Fusion Drawings (PAS128 QL-D)
  • EV Planning Drawings
  • Substation Red & Green Mark-ups (Schemes and As-builts)
  • Legal Drawings,  Sale Plans, Location Plans
  • Engineering Design & Drawing Deliverables
  • Remote Drawing Management & Site Systems Analysis & Scanning

As previously communicated Centara took the decision to ‘Furlougha number of our site/field based workers as the country entered lockdown as advised by the Prime Minister (23.03.2020).   We have subsequently been advised by  (Secretary of State Letter to UK Construction Industry) that key construction works should continue. As such  Centara have developed safe operating procedures (SOP) and updated our safe systems of work (SSOW) to protect our employees and third parties from the spread of the virus. We can now continue to provide resources to support our clients with key works for Energy, Utilities, Rail, Highways and Critical / Key Construction projects throughout the COVID-19 Lockdown. The services we are providing include:

  • Utility Mapping (PAS128)
  • Ground Penetrating Radar (GPR)
  • As-built Survey – Power
  • Topographical Surveying
  • UAV Surveys
  • 3D Laser Scanning
  • CCTV  Drainage Surveys
  • Substation Engineering Design & Drawing Management

Our management team are all available to produce tenders, quotations and discuss new and ongoing projects. If customers have any new requirements or want to discuss an ongoing project please contact us via 01924 220726, info@centara-ltd.com or via the link on our website – http://www.centara-ltd.com/request-a-survey/

RT @CentaraMaps: @LUFC @CentaraMaps at Elland Road today mapping buried services around the hallowed turf #gpr #utilitymapping #lufc #mot #…

© 2020 Centara Ltd